98 completed projects across building construction, building maintenance, and marine & offshore fabrication.
Anchor Handling Supply Vessel 100M / H-862B
PT. Jaya Asiatic Shipyard· Tanjung Uncang, Batam
2006 - 2007
Proposed Reinstatement Work (Lot 272)
PT. Batamindo Investment Cakrawala· Lot 272 Muka Kuning, Batam
Proposed resurfacing asphalt (May 2006)
PT. Batamindo Investment Cakrawala· Batamindo Industrial Park, Muka Kuning, Batam
16-05-06 to 22-05-06

Accommodation Cum Work Barge 100.58M / H-052
PT. Jaya Asiatic Shipyard· Tanjung Uncang, Batam
2005
Proposed Reinstatement Work (Lot 17)
PT. Batamindo Investment Cakrawala· Lot 17 Muka Kuning, Batam
Proposed DAM outside Phase 3 BIP
PT. Batamindo Investment Cakrawala· Batamindo Industrial Park, Muka Kuning, Batam
07-05-07 to 20-07-07
Anchor Handling Supply Vessel 63M / H-849
PT. Jaya Asiatic Shipyard· Tanjung Uncang, Batam
2004 - 2005
Proposed Boundary Wall Fence
PT. Batamindo Investment Cakrawala· Muka Kuning, Batam
Proposed rise earth DAM Level BIP
PT. Batamindo Investment Cakrawala· Batamindo Industrial Park, Muka Kuning, Batam
05-11-07 to 05-12-07
Proposed Slope Repair
PT. Batamindo Investment Cakrawala· Muka Kuning, Batam
October 2008 – February 2009
Anchor Handling Supply Vessel 70M / S-848
PT. Jaya Asiatic Shipyard· Tanjung Uncang, Batam
2004 - 2005
Proposed sludge shelter at STP
PT. Batamindo Investment Cakrawala· Batamindo Industrial Park, Muka Kuning, Batam
28-09-08 to 10-01-08